Product catalogue
750 CP
230V
Use
Use
Model
Model
Control unit
Part Number
Cont ol unit
Part Number
Single-leaf max. length (m) i l l . l
Use frequency (cycles/day) Max. weight (kg)
Use frequency (cycles/day)
750 CBAC Pump Unit 750 SB Pump Unit 100° opening jack 180° opening jack
1.80
/ /
45 45
Not included Not included Not included Not included
107720 107721 108759 108760
3.5
/ /
800 800
/ /
The jack packages include: a hydraulic jack, oil bottle to fill the pipes. The 750 control unit packages include: a hydraulic control unit with hydraulic lock at opening/closing ( 750 CBAC ), without lock ( 750 SB ), and a thrust capacitor 8 µF 400 V. The foundation box package includes: a foundation box in steel, a cover in stainless steel, a grooved collar and installation accessories.
COMPONENTS AND SPECIFIC ACCESSORIES
Foundation box (with collar) 490071
Pump housing 720309
Drive collar for 750CP 7309165
Offset geometry arm* 738704
End User handover booklet N-DOC1
pack of fittings (4 male, 4 female) 390421 (40 male, 40 female) 390440
Lock for housing (viro lock) 712805
coil of flexible hose (10m) 390422 390439 (100m)
455D control board 790917
*please note when using the offset geometry arm, a 180° operator is required.
TECHNICAL SPECIFICATIONS OF HYDRAULIC JACK
TECHNICAL SPECIFICATIONS OF 750 CP
750 CBAC
750 SB
100° opening
180° opening
Rotation maximum angle
118°
200°
Power supply voltage Absorbed power Absorbed current Motor rotation speed
230 V ac (+6% -10%) 50 (60) Hz
Angular speed Effective torque Protection class
7.8°/s (750 CBAC-SB) 543 Nm (750 CBAC - SB)
220 W
1 A
IP 67
1400 r.p.m. 0.75 l/min
Motor rotation speed
1400 r.p.m.
Pump flow rate
Operating ambient temperature
-20 °C to +55 °C
Protection class
IP 55
Thermal protection on motor winding
120 °C 7.5 kg
Weight
Type of oil
FAAC HP OIL
foundation box 420 x 254.5 x 205 mm - control unit 353 x 245.6 x 141.5 mm
Dimensions (L x D x H) in mm
Notes • IMPORTANT: The CP jacks must be supplied with a foundation box. • An electric lock should be installed for control units without a lock facility. • The operator with lock facility is not recommended when there is no access to the manual release device (panelled leaves or no other access to the property). • You’ll need the following for a two-leaf gate: two control units, twoMod. LM. enclosures, two foundation boxes, two jacks CP, an electronic control unit , safety devices and, if necessary, an electric lock. Additional hose and 2 packs of fittings required.
Useful Accessories
Keypads
Safety Edges
Photocells
Prox readers
Made with FlippingBook - Online Brochure Maker